Tuesday, May 20, 2014

Process of Design and Construction

2X4 Wood acquired for building
Lacrosse mesh (soon to be transformed into a sling)
Metal Rod
Base being built
Base built (with wood underneath to hold weight)

Base arms being added


First swinging arm being built
Metal rod being attached to support swinging arm
Weights added, Batman I ready to go
R.I.P. Batman I
ditch the first lacrosse head, take the second lacrosse head (pictured at top) and use its mesh for sling mechanism.
Sling
re-use first swinging arm, attach sling to end
testing weight hold and modifying sling mechanism
reinforcers added
One last sling modifier
(after spray paint dried) trigger installed at base of catapult